Right last night I demolished the left wall of the church, really wasn’t happy with it, nothing was aligned and all a bit ropey. So knocked it down and rebuilt it. It’s looking much happier now. Still a few foibles here and there, but should add to the character of the finished build.
Also started the steps at the front. Need to detail them. I also need to find a suitably sized piece of half-tubing to fill in the missing gaps at the bottom of all the arches. Sure something will turn up, otherwise I’ll be chopping doweling in half, never easy!